Some elevator lobbies to close in Wittson Hall

In the coming months, the elevator lobbies for levels three, four and five in Wittson Hall will be closed due to renovations associated with the Wittson Hall/Wigton Heritage Center project.

See map of area affected by the renovations.

  • Stairwell A (in red) is currently closed through Feb. 2, 2021.
  • Level four elevator lobby is the first of three phases. This closure (in orange) will begin on Sept. 30 and last through Feb. 2.
  • Elevators will need to be accessed from another level during this time.
  • Stairwell C (North Side), in green on the layout, leads down to level two, and level two elevator access will not be affected during these renovations.

Please contact Chris Ehlers or Heather Kock with questions.

fU psdhYWV