Concrete work scheduled at Shackelford Hall

UNMC emblem

UNMC will be doing concrete work on the north face of Shackelford Hall from Oct. 17-20, then again from Oct. 24-27.

During these times, the sidewalk on the south side of Emile Street — in front of Shackelford Hall — will be closed with safety barricades. 

Pedestrians will continue to have access to the crosswalk across Emile Street to Lot 50, and the west staircase connected to Shackelford Hall that leads to Lot 50 will remain open.

thTjm skYvuAU G